Renowned Client Project Reference List
Over recent years our associate team members have undertaken work with the following renowned companies:
End Client |
Project Title |
Date |
Engineer |
---|---|---|---|
Chevron-Phillips (via Simon Carves) |
FEED for a Low Density Polyethylene Plant |
2015 |
SN |
National Grid (via Costain) |
FEED for Compressor Station upgrade |
2015 |
SN |
BG (Tunisia) BG (Trinidad & Tobago) via ABB contract. |
Pressure relief device assessments for offshore gas production platform and onshore terminal |
2014 |
ASJB |
Nigerian Petroleum Development corporation (NPDC) |
Operational debottleneck to achieve 100 mmscfd from current 80 mmscfd
|
2014 |
AK |
OMV Tunisia |
Operational Risk and Process Hazard Risk Reduction for OMV Tunisia |
2014 |
AK |
ZADCO (UAE), BP Khazzan (Oman),
|
Petrofac Asset Assurance Review for the following EPC contracts, ZADCO Island Facilities (UAE), BP Khazzan (Oman), Sonatrech Alrar Upgrade (Algeria), PDO Rabab Harwell (Oman) |
2014 |
AK |
Centrica (via Costain) |
FEED followed by Detailed Design for upgrade of an Onshore Gas Processing Facility |
2013/14 |
SN |
BP (Baku, Azerbaijan) via ABB contract |
Relief Assurance |
2013 |
ASJB |
Centrica Gas Terminal – UK |
PHAST Modeling for Centrica Storage Limited – Offshore and Onshore Assets. |
2013 |
AK |
Sabic (via Jacobs) |
FEED for a $6billion Mining / Fertiliser Project |
2012/13 |
SN |
Croda Chemicals via ETDE contract |
Acrylic polymers facility. Checking of process design and commissioning procedures. |
2012/13 |
ASJB |
Croda Chemicals |
Acrylics polymer facility. |
2012/13 |
MF |
TCO – Chevron – Tengiz Kazakhstan |
HazOp/SOA for Chevron / TCO FGP Onshore Gas Plant, Kazakhstan |
2012 |
AK |
Confidential - Brazil |
8 X FLNG & FEED Verification for a Confidential Client. Location Santos Basin, Brazil |
2012 |
AK |
QCLNG – Queensland, Australia |
Survivability Systems Assessment for BG QCLNG Facility, Queensland Australia |
2012 |
AK |
Hess SPAR |
Performance Standards for Hess SPAR Platform Gulf of Mexico |
2012 |
AK |
Petrobas - Brazil FPSO |
Independent Design Safety Review, Flare Stream Review, BP Azerbaijan ACG . PHAST dispersion & radiation model. |
2012 |
AK |
BP Angola FPSO |
Independent Process Engineer for BP Angola Gt. Plutonio FPSO. HazOp Gas Compression. |
2012 |
AK |
BG Thailand |
Verification of Relief, Flare, Blowdown & Fire Protection (Active & Passive) for PTTPE Bongkot Platform (Gulf of Thailand), |
2012 |
AK |
BG Tunisia |
Design Assurance for Hannibal Gas Treatment Plant BG Tunisia |
2011/12 |
AK |
BG Tunisia |
Design review of LPG Pipeline Gabes to Sfax, BG Tunisia. |
2011 |
AK |
BG Kazakhstan |
Design Verification of BG Kazakhstan Petrochemical Complex, Train 4, |
2011 |
AK |
AMEC (Trinidad and Tobago) |
Flow Assurance and Blowdown Design assurance for offshore platform Trinidad & Tobago |
2011 |
AK |
Starfish Platform (AMEC) North Sea |
Design Assurance for Starfish Platform (Trinidad & Tobago) & Dragon LNG facility (UK) |
2011 |
AK |
BG Tunisia |
Design Assurance for Hasdrubal Gas Treatment Plant BG Tunisia |
2011 |
AK |
Jasmine Platform (Conoco Phillips) North Sea |
Design Verification of Jasmine Development (North Sea). Validation of HYSYS and FLARENET models, fire protection & ESD systems |
2011 |
AK |
Sellafield (via Nuvia) |
FEED for £1billion Nuclear Project |
2011 |
SN |
Saudi Aramco, |
Charing SIL Assessment, Yanbu Refinery & Al Jubail Butane Surge System. |
2010 |
AK |
Fluor Arabia/SABIC/Saudi Kayan, |
Al Jubail, Propane, Flare, Berths & MVCS Systems Chaired HazOp & SIL Studies, QRA for Al Jubail Port Tank Farm. |
2010 |
AK |
Aker Kvaerner, North Sea |
North Sea Platform, Safety Case AH-001 Update |
2010 |
AK |
PTT E&P, Thailand |
Bongkot Offshore Platform QRA and Fire and Explosion Risk Study (Consequence modelling with DNV PHAST) |
2010 |
AK |
Tecnicas Reunidas, Madrid, |
Chair HazOp, SIL & QRA on SATORP Refinery at Jubail KSA |
2010 |
AK |
Oman Gas Company & Mott McDonald (Oman), |
QRA for Onshore Gas Facility (Consequence modeling with Shell FRED/SHEPHERD & output from HYSYS, FLARENET). Including drafting of the fire and evacuation philosophy and emergency response measures |
2009 |
AK |
Blue Water Energy Services |
Safety engineering & classification support for S.P.M, Fujairah |
2009 |
AK |
Hindustan Petroleum Company |
Single Point Moorings for India Offshore, & Brunei BEDM |
2009 |
AK |
ATP Oil & Gas. ABS Class Rules |
Verification of safety engineering & elements against offshore design specs |
2009 |
AK |
Mitsui Oil Lines |
Financial Risk Review and technical engineering support to conceptual LNG FPSO |
2009 |
AK |
MOL (Japan) |
MOL Engineering support for Pre Feed study on LNG FPSO/FSRU design including fault and event tree development |
2009 |
AK |
KNPC (Kuwait) |
Kuwait Petroleum Company. Delivered Safety and Risk Assessment, training course. |
2009 |
AK |
SBM (Holland) |
LNG FPSO Safety Case for Petrobas Brazil. |
2009 |
AK |
Dragon Steel, Taiwan and POSCO, South Korea via Thyssen Krupp |
Coking plant commissioning
|
2008 |
MF |
Quickflange (Norway) |
Certification of flange technology for South American offshore market. |
2008 |
AK |
PTTPE Thailand |
PTTPE Polymers / Bechtel, Thailand, Detailed Design for LDPE Plant |
2008 |
AK |
PTTPE Thailand via Simon Carves Contract |
Detailed design for a Low Density Polyethylene Plant; extrusion, passive fire protection, pellet conveying and degassing. |
2007/08 |
ASJB |
PTTPE Thailand via Simon Carves |
FEED followed by detailed design for a Low Density Polyethylene Plant |
2007/08 |
SN |
Shell |
FEED on various refinery projects working for the Projects Department at Stanlow Refinery |
2007 |
SN |
Amir Kabir (Iran) |
Amir Kabir Petrochemical Co., Iran. LDPE Plant, EPC Detailed Design |
2007 |
AK |
ConocoPhillips |
FEED on various refinery projects working for the Process Engineering Department at Stanlow Refinery |
2007 |
SN |
Huntsman Chemicals Via Simon-Carves contract |
FEED followed by detailed design for a Low Density Polyethylene Plant. Mainly responsible for pressurised water closed loop reactor cooling / heating system. |
2007 |
ASJB |
Gasification projects:
I.Drying and
Gasifying Sewage Sludge
II.Drying and Gasifying Tannery residues
III.Power generation using supermarket waste biomass
IV.Design, development and commissioning of novel cross draft gasifier
V.Heat generation using Rice Husk gasifier
VI.Charcoal gasifier for tubewell operation
VII.Feasibility of village electrification from 100kW – 500 kW
VIII.Design and development of high pressure circulating fluidised bed gasifer for coal
X. Thermodynamic and process simualtion of carbon capture systems using Computational Fluid Dynamics (CFD) and Aspen Plus for Alstom Switzerland
Recent training programmes:
Engineering council
i.Project Management for Process Engineers
ii.Role of Process Engineer in Contracting Environment
iii.Rules of Thumb for Process Engineers
iv.Process risk assessment
v.Project risk Management
Mamara Research Institute Gabze:
i.Fixed Bed Gasification
ii.Fluidised bed gasification
iii.Plasma gasification systems
HGL’s previous projects include:
Description |
Responsibilities |
Remarks |
Solar power assisted advanced vacuum distillation unit for harvesting base oil from spent lubes – 1tpd Multan – Shortlisted for 2020 IChemE UK Global Award |
Design, Build, commissioning, Operation |
HGL |
R&D High Temperature Pyrolyser, Newcastle University/Durham University |
Design, Build, commissioning, Operation |
HGL |
R&D High Temperature Pyrolyser, Lahore University |
Design, Build, commissioning, Operation |
HGL |
Commercial scale advanced vacuum distillation unit for harvesting base oil from spent lubes – 100 tpd Saudi Arabia - – Shortlisted for 2015 IChemE UK Global Award |
Design, Build, commissioning, Operation |
HGL |
Commercial scale 300 kg/h multi draft fixed bed gasifier processing wood waste and producing power for a factory in Islamabad. |
Design, Build, commissioning, Operation |
HGL |
R&D entrained flow circulating gasifier, Multan University. |
Design, Build, commissioning, Operation |
HGL |
R&D 10 kg/h vertical torch gasifier, Lahore University. |
Design, Build, commissioning, Operation |
HGL |
R&D 50 kg/h throated gasifier, Lahore University. |
Design, Build, commissioning, Operation |
HGL |
Commercial 100 kg/h throated gasifier processing leather waste to recover Chromium, British Leather Corporation. |
Design, Build, commissioning, Operation |
On behalf of Waste to Energy Ltd. |
Commercial 500 kg/h throated gasifier processing dried sewage sludge for Anglian Water. |
Design Project Co-ordination |
On behalf of Waste to Energy Ltd. |
R&D throated gasifier for Newcastle University. |
Operation optimization, project coordination and PhD supervision |
On behalf of Waste to Energy Ltd. |